[1]王元清,姚南,张天申,等.基于最优化理论的多阶段模型修正及其在桥梁安全评估中的应用\[J\].工程力学,2010,27(1):9197.WANG Yuanqing,YAO Nan,ZHANG Tianshen,et al. An application of multistage model updating based on optimization theory to the safety appraisal of bridge\[J\], Engineering Mechanics, 2010,27(1):9197.(in Chinese)[2]陈宇.有限元模型修正技术在桥梁工程中的应用研究\[D\]. 成都:西南交通大学,2009.CHEN Yu.Research on the Application of Finite Element Model Updating Technique in Bridge Engineering\[D\].Chengdu:Southwest Jiaotong University,2009.(in Chinese)[3]刘继承,周传荣.一个基于优化的有限元模型修正方法\[J\].振动与冲击,2010,22(2):330340.Liu Jicheng,Zhou Chuanrong. FE model updating method based on optimization\[J\].Journal of Vibration and Shock, 2010,22(2):330340. (in Chinese)[4]荣见华,郑建龙,许飞鸿.结构动力修改及优化设计\[M\].北京:人民交通出版社,2011.[5]Salama M, Rose T, Garba J.Optimal placement of exciters and sensors for verification of large dyna\|mical systems\[C\]//Kedward KT. Proceedings of SDM conference,AIAA870782,1987:10241031.[6]Imamovic N.Model validation of large finite element model using test data\[D\].London: Imperial College,1998.[7]Berman A, Nagy E J. Improvement of a large analy\|tical model using test data\[J\].AIAA J,1983,21(8):11681173.[8]朱宏平,徐斌,黄玉盈.结构动力模型修正方法的比较研究及评估\[J\].力学进展,2002,32(4):513525.Zhu Hongping, Xu Bin, Huang Yuying. Comparison and evaluation of analytical approaches to structural dynamic model correction\[J\]. Advances in Mechanics,2002,32(4):513525.(in Chinese)[9]白宝玉,王丽荣.桥梁工程\[M\].北京:高等教育出版社,2002. [10]邵旭东,程翔云,李立峰.桥梁设计与计算\[M\].北京:人民交通出版社,2006.