[1] 秦巍,郭永富.一种基于历史遥测数据的在轨卫星故障预警系统[J].航天器工程,2010, 19(6):40-45. QIN Wei, GUO Yong-fu. A failure warning system based on history telemetry data[J].Spacecraft Engineering, 2010, 19(6):40-45. (in Chinese)
[2] 房红征,史慧,韩立明,等.基于粒子群优化神经网络的卫星故障预测方法[J].计算机测量与控制,2013,21(7):1730-1733. FANG Hong-zheng, SHI Hui, HAN Li-ming,et al.Method of prognostics for satellite based on particle swarm optimized neural network[J].Computer Measurement & Control.2013,21(7):1730-1733. (in Chinese)
[3] 杨悦,杨永安,胡绍林.逐段回归近似的卫星遥测数据挖掘算法与仿真[J].计算机仿真,2013,30(8):109-112. YANG Yue, YANG Yong-an, HU Shao-lin. Ming algorithm and simulation of satellite telemetry data based on piecewise regression approximation method[J].Computer Simulation,2013,30(8):109-112.(in Chinese)
[4] 蔡国伟,杜毅,李春山,等. 基于支持向量机的中长期日负荷曲线预测[J]. 电网技术,2006,30(23):56-60. CAI Guo-wei, DU Yi, LI Chun-shan, et al. Middle andlong-term daily load curve forecasting based on supportvector machine[J].Power System Technology,2006, 30(23):56-60.(in Chinese)
[5] 李伟,闫宁,张振刚.基于粗糙集的混合支持向量机长期电力负荷预测研究[J].电力系统保护与控制,2010,38(13):31-34. LI Wei, YAN Ning, ZHANG Zhen-gang. Study on long-term load forecasting of MIX-SVM based on rough set theory [J]. Power System Protection and Control, 2010,38(13):31-34.(in Chinese)
[6] 王颖林,赖芨宇,郭丰敏.建设需求量预测分析中的人工神经网络和多元回归方法[J]. 武汉工程大学学报,2013,35(11):77-80. WANG Ying-lin, LAI Ji-yu ,GUO Feng-min. Construction demand forecasting by artificial neural networks and multiple regression[J].Journal of Sichuan University(Engineering Science Edition), 2013,35(11):77-80. (in Chinese)
[7] 张伏生,刘芳,赵文彬,等.灰色 Verhulst 模型在中长期负荷预测中的应用[J].电网技术,2003,27(5):37-81. ZHANG Fu-sheng, LIU Fang, ZHAO Wen-bin, et al. Application of grey Verhulst model in middle and longterm load forecasting[J]. Power System Technology,2003,27(5):37-81.(in Chinese)
[8] 肖云,周春梅,虞珏,等.大冶铁矿滑坡预测模型研究[J].武汉工程大学学报,2010,32(1):9-11. XIAO Yun, ZHOU Chun-mei ,YU Jue, et al. Study on prediction model in Hubei Daye iron mine slope[J].Journal of Wuhan Institute of Technology, 2010,32(1):9-11.(in Chinese)
[9] 李先福,魏雨溪,杨红梅.黄茨滑坡时间预报分析[J].武汉工程大学学报,2013,35(4) :52-53. LI Xian-fu, WEI Yu-xi ,YANG Hong-mei. Time forecast for Huangci landslide by back analysis[J].Journal of Wuhan Institute of Technology, 2013,35(4):52-53. (in Chinese)
[10] 邓聚龙.灰色预测与决策[M].武汉:华中理工大学出版社,1989. DENG Ju-long. Grey prediction and decision [M].Wuhan: Huazhong University of Science and Technology Press,1989.(in Chinese)
[11] 孟祥星,田成微,冬雷等.灰色理论用于风力发电容量中长期预测的研究[J].电力系统保护与控制,2011,39(21):81-84. MENG Xiang-xing, TIAN Cheng-wei ,DONG Lei, et al. A study of grey theory used in prediction of medium and long-term wind power generation[J].Power System Protection and Control, 2011,39(21):81-84. (in Chinese)
[12] 袁明友,肖先勇,杨洪耕等.基于灰色理论的供电系统负荷中长期预测模型及其应用[J].四川大学学报:工程科学版,2002,34(4):121-123. YUAN Ming-you, XIAO Xian-yong, YANG Hong-geng, et al. The Grey Model of Middle-long Term Load Forecasting and its Applications in the Power Supplying Systems [J].Journal of Sichuan University: Engineering Science Edition,2002,34(4):121-123. (in Chinese)
[1]任国恒,王健,朱海.灰色理论用于遥测数据中长期预测[J].武汉工程大学学报,2014,(05):74.[doi:103969/jissn16742869201505016]
REN Guo heng,WANG Jian,ZHU Hai.Prediction of medium and longterm telemetry data by grey theory[J].Journal of Wuhan Institute of Technology,2014,(04):74.[doi:103969/jissn16742869201505016]