[1] 卢海林. 预应力混凝土曲线箱梁剪力滞效应理论分析与试验分析[D]. 天津:天津大学,2005.LU Hai?鄄lin. Theoretical analysis and experimental study on shear-lag effect of prestress concrete curved box beam[D]. Tianjin: Tianjin University,2005. (in Chinese)[2] FABRIZIO Gara, GRAZIANO Leoni, LUIGINO Dezi. A beam finite element including shear lag effect for the time?鄄dependent analysis of steel?鄄concrete composite decks[J].Engineering Structures,2009,31:1888-1902.[3] 陈鸿鸣,乔静宇. 混凝土箱梁剪力滞研究现状与发展[J]. 结构工程师,2011,27(1):161-166.CHEN Hong-ming, QIAO Jing-yu. State of the art about shear lag effect of concrete box girder bridges[J]. Structural Engineering,2011,27(1):161-166. (in Chinese)[4] 刘健新,马麟,胡庆安.薄壁箱梁振动时的剪力滞效应[J].郑州大学学报,2008,29(3):122-128.LIU Jian-xin, MA Lin, HU Qing-an. The research of analysis method of shear lag's effect on forced vibration of thin-wall box-girder[J]. Journal of Zhengzhou University, 2008, 29(3): 122-128. (in Chinese)[5] 徐勋,卫星,刘德军,等.扁平曲线箱梁静动力分析[J].公路交通科技,2007,24(12):60-65.XU Xun, WEI Xing, LIU De-jun,et al. Analysis for static and dynamic characteristics of flat curved box beam[J]. Journal of Highway and Transportation Research and Development,2007,24(12):60-65. (in Chinese)[6] 蔡汶珊. 薄壁曲线箱梁剪力滞数值计算与实验研究[D]. 长沙:长沙理工大学,2010.CAI Wen-shan. Numerical calculate and experimental research about shear lag effect of curved thin wall box girders[D]. Changsha: Changsha University of Science & Technology, 2010. (in Chinese)[7] 卢海林,张伟,颜昌雄. 移动荷载速度对悬臂曲线箱梁剪力滞效应的影响[J]. 武汉工程大学学报,2014,36(3):18-21.LU Hai-lin, ZHANG Wei, YAN Chang-xiong. Moving load speed on shear lag effect of cantilever curved box girder[J]. Journal of Wuhan Institute of Technology,2014,36(3):18-21. (in Chinese)[8] HUGO C Gomeza,PAUL J Fanning,MARIA Q Fenga, et al. Testing and long?鄄term monitoring of a curved concrete box girder bridge[J]. Engineering Structure,2011(33):2861-2869.[9] 王新敏. ANSYS工程结构数值分析[M]. 北京:人民交通出版社,2007.WANG Xin-min. ANSYS numerical analysis of engineering structural[M]. Beijing: China Communications Press, 2007. (in Chinese)[10] 李洪. 曲线连续箱梁桥梁剪力滞效应分析及实用计算[D]. 北京:北京交通大学,2010.LI Hong. Analysis of the shear lag effect in curved continuous box-girder bridge and the research on practical calculating method[D].Beijing:Beijing Jiaotong University,2010. (in Chinese)[11] 赵云安,王炎. 车辆荷载作用下连续箱梁桥剪力滞效应分析[J]. 铁道建筑,2013(2):9-11.ZHAO Yun-an, WANG Yan. Analysis of the shear lag effect in curved continuous box-girder bridge under the vehicle load[J]. Railway Engineering,2013,(2):9-11. (in Chinese)
[1]卢海林,张 山,万崇勇,等.静动荷载作用下简支预应力混凝土曲线箱梁剪力滞效应分析[J].武汉工程大学学报,2016,38(05):465.[doi:10. 3969/j. issn. 1674?2869. 2016. 05. 011]
LU Hailin,ZHANG Shan,WAN Chongyong,et al.Shear Lag Effect of Curved Box Girder of Simply-Supported Prestressed Concrete Under Static and Dynamic Load[J].Journal of Wuhan Institute of Technology,2016,38(05):465.[doi:10. 3969/j. issn. 1674?2869. 2016. 05. 011]
[2]卢海林*,郝 静,薛凯仪,等.单箱双室曲线箱梁剪力滞效应分析[J].武汉工程大学学报,2019,(05):471.[doi:10. 3969/j. issn. 1674?2869. 2019. 05. 012]
LU Hailin*,HAO Jing,XUE Kaiyi,et al.Shear Lag Effect of Single-Box Double-Cell Curved Box Girder[J].Journal of Wuhan Institute of Technology,2019,(05):471.[doi:10. 3969/j. issn. 1674?2869. 2019. 05. 012]