[1]卢海林.预应力混凝土曲线箱梁剪力滞效应理论分析与试验分析[D].天津:天津大学,2005.LU Hailin.Theoretical analysis and experimental study on shearlag effect of prestress concrete curved box beam[D].Tianjin:Tianjin University,2005.(in Chinese)[2]万海滨.曲线预应力混凝土箱梁剪力滞效应研究[D].西安:长安大学,2008.WAN Haibin.Study on shear lag effect of curved prestressed concrete box girder[D].Xian:Changan University,2008.(in Chinese)[3]蔡汶珊.薄壁曲线箱梁剪力滞数值计算与实验研究[D].长沙:长沙理工大学,2010.CAI Wenshan.Numerical calculate and experimental research about shear lag effect of curved thin wall box girders[D]. Changsha:Changsha University of Science & Technology,2010.(in Chinese)[4]刘建新,马麟,胡庆安.薄壁箱梁振动时的剪力滞效应[J].郑州大学学报,2008,29(3):122128.LIU Jianxin,MA Lin,HU Qingan.The research of analysis method of shear lag’s effect on forced vibration of thinwall boxgirder[J].Zhengzhou:Journal of Zhengzhou University,2008,29(3):122128.(in Chinese)[5]张永健,黄平明,狄谨,等.波形钢腹板组合箱梁自振特性与试验研究[J].交通运输工程学报,2008,8(5):7680.ZHANG Yongjian,HUANG Pingming,DI Jin,et al.Free vibration characteristics and experiment study of composite box girder with corrugated steel webs[J].Journal of Traffic and Transportation,2008,8(5):7680.(in Chinese)[6]甘亚南,周广春.基于能量变分原理的薄壁箱梁自振特性分析[J].中国公路学报,2007,20(1):7378.GAN Yanan,ZHOU Guangchun.Analysis of free vibration characteristics of thinwalled box girder based on energy variation principle[J].China Journal of Highway and Transport,2007,20(1):7378.(in Chinese)[7]TAYSI N,OZAKC M.Free vibration analysis and shape optimization of boxgirder bridges in straight and curved planform[J].Engineering Structures,2002(24):625637.[8]GOMEZA H C,FANNING P J,FENGA M Q,et al.Testing and longterm monitoring of a curved concrete box girder bridge[J].Engineering Structures,2011(33):28612869.[9]项海帆,姚玲森.高等桥梁结构理论[M].北京:人民交通出版社,2001.XIANG Haifan,YAO Lingsen.The theory of higher bridge structure[M].Beijing:China Communications Press,2001.(in Chinese)[10]王新敏.ANSYS工程结构数值分析[M].北京:人民交通出版社,2007.WANG Xinmin.ANSYS numerical analysis of engineering structural[M].Beijing:China Communications Press,2007.(in Chinese)
[1]卢海林,朱松波,周小龙,等.不同荷载作用下直线箱梁剪力滞效应分析[J].武汉工程大学学报,2014,(12):39.[doi:10. 3969/j. issn. 1674-2869. 2014. 012. 008]
,ZHOU Xiao-long,et al.Shear lag effect of straight box girder under different loads[J].Journal of Wuhan Institute of Technology,2014,(03):39.[doi:10. 3969/j. issn. 1674-2869. 2014. 012. 008]
[2]卢海林,张 山,万崇勇,等.静动荷载作用下简支预应力混凝土曲线箱梁剪力滞效应分析[J].武汉工程大学学报,2016,38(05):465.[doi:10. 3969/j. issn. 1674?2869. 2016. 05. 011]
LU Hailin,ZHANG Shan,WAN Chongyong,et al.Shear Lag Effect of Curved Box Girder of Simply-Supported Prestressed Concrete Under Static and Dynamic Load[J].Journal of Wuhan Institute of Technology,2016,38(03):465.[doi:10. 3969/j. issn. 1674?2869. 2016. 05. 011]
[3]卢海林,张 伟,南子俊,等.移动荷载速度对悬臂曲线箱梁剪力滞效应的影响[J].武汉工程大学学报,2014,(03):52.
LU Hai-linZHANG WeiNAN Zi-junQIAN Chao-bangZHANG Shan.Moving load speed on shear lag effect of cantilever curved box girder[J].Journal of Wuhan Institute of Technology,2014,(03):52.