|本期目录/Table of Contents|

[1]李元松,郭志明,王明华.石宝寨文物保护工程的施工监控[J].武汉工程大学学报,2008,(03):40-43.
 LI Yuan song,GUO Zhi ming,WANG Ming hua.Construction monitoring and measurement of Shibaozhai cultural relic protection project[J].Journal of Wuhan Institute of Technology,2008,(03):40-43.
点击复制

石宝寨文物保护工程的施工监控
(/HTML)
分享到:

《武汉工程大学学报》[ISSN:1674-2869/CN:42-1779/TQ]

卷:
期数:
2008年03期
页码:
40-43
栏目:
资源与土木工程
出版日期:
2008-03-31

文章信息/Info

Title:
Construction monitoring and measurement of Shibaozhai
cultural relic protection project
文章编号:
16742869(2008)03004004
作者:
李元松12郭志明1王明华1
1.武汉工程大学环境与城建学院,湖北 武汉 430074;
2.武汉理工大学土木与建筑学院,湖北 武汉 430070
Author(s):
LI Yuansong12 GUO Zhiming1 WANG Minghua1
1. School of Environmental and Civil Engineering, Wuhan Institute of Technology, Wuhan, 430074,China;
2. School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan, 430070,China
关键词:
边坡挡墙施工监控
Keywords:
slope retaining wall construction measurement and monitoring
分类号:
TP 311
DOI:
-
文献标志码:
A
摘要:
以不同的监测仪器,通过对T形桩、扶壁式挡墙结构内力、水平位移、垂直位移,墙内填土的水压力,以及边坡仰墙中锚杆应力的观测,对石宝寨文物保护工程的施工过程进行监测监控,为支护设计提供及时准确的反馈信息.同时对观测数据,结合施工过程进行理论分析,为同类工程提供有益的参考,也为工程竣工后的运营提供永久性安全监测奠定基础.
Abstract:
Different measurement instruments were used respectively to monitor the stresses, horizontal displacements and vertical displacements within TShape pile and retaining structure, the water pressure of filled soil inside the counterfort retaining wall and the rockbolt stresses in the up support retaining wall, etc. The monitoring and control were implemented in construction process of Shibaozhai cultural preservation project. A large amount of feedback information was provided for shoring design. These data have been analyzed and discussed based on the project characteristic and construction process. All these results provide the beneficial reference for the same kind of engineering and laid the foundation for permanent safety monitor after the project finished.

参考文献/References:

[1]施亚霖,杨顺安. 多项监测和信息化施工在深基坑工程中的应用[J]. 西部探矿工程,2003,(5):1315.
[2]朱合华,姜勇,夏才初,等. 复杂地质条件下隧道信息化施工综合技术研究[J]. 岩石力学与工程学报, 2002,(2):25482553.
[3]陈勇鹏.监控量测与信息化施工[J]. 铁道建筑技术,2004,(5):6768.
[4]杨林德,潘洪科,王志义. 复杂工程地质条件下公路隧道开挖及其监控量测[J]. 中南公路工程,2006,(6):15.
[5]王浩,覃卫民,汤华. 关于深基坑施工期监测现状的一些探讨[J]. 岩土工程学报,2006,(5):17891793.
[6]二滩水电开发有限公司.岩土工程安全监测手册[M]. 北京:中国水利水电出版,1999:350400.

相似文献/References:

[1]谭光虹.晋宁磷矿排土场及露天采空区地质灾害的治理[J].武汉工程大学学报,2011,(03):104.[doi:10.3969/j.issn.16742869.2011.03.029]
 TAN Guang hong.On geological disasters control of wastedump and miningout area in Jinning Phosphate[J].Journal of Wuhan Institute of Technology,2011,(03):104.[doi:10.3969/j.issn.16742869.2011.03.029]

备注/Memo

备注/Memo:
收稿日期:20071012
作者简介:李元松(1964),男,湖北应城人,副教授,博士研究生.
研究方向:土木工程结构数值分析和土木工程施工监控技术研究.
更新日期/Last Update: