[1] 廖宇. 大悬臂弧线底板城市高架箱梁桥剪力滞效应研究[D]. 长沙:中南大学,2010.LIAO Yu. Analysis of shear lag in arc bottom urban elevated box girder bridge with large cantilever[D].Changsha:Central South University,2010.(in Chinese)[2] FOUTCH D A, CHANG P C. A shear lag anomaly [J].Structural Engineering (ASCE),1982, 108 (7):1653-1658. [3] SUNG C L, CHAI H Y, DONG Y. Analysis of shear lag anomaly in box girders[J].Structural Engineering (ASCE),2002, 128(11):1379-1386.[4] SHUSHKEWICH K W. Negative shear lag explained [J].Structural Engineering(ASCE),1991,117(11):3543-3546.[5] 陈利鹏.地震荷载作用下曲线箱梁剪力滞效应研究[D]. 武汉:武汉工程大学,2014.CHEN Li-peng. Analysis of shear lag in curved box girder under seismic loads[D].Wuhan: Wuhan Institute of Technology,2014.(in Chinese)[6] 邹毅松,李成君,易祥军. 薄壁箱梁剪力滞效应计算方法研究[J]. 桥梁与隧道工程,2012(5):93-98.ZOU Yi-song, LI Cheng-jun, YI Xiang-jun. Calculation of shear lag effect of thin-walled box girder [J]. Bridge&Tunnel Engineering, 2012(5):93-98.(in Chinese)[7] 蔡汶珊.薄壁曲线箱梁剪力滞数值计算与实验研究[D]. 长沙:长沙理工大学,2010.CAI Wen-shan. Numerical calculate and experimental research about shear lag effect of curved thin wall box girders [D]. Changsha: Changsha University of Science & Technology, 2010.(in Chinese)[8] 卢海林. 预应力混凝土曲线箱型梁剪力滞效应理论分析与试验研究[D]. 天津:天津大学,2005. LU Hai-lin. Theoretical analysis and experimental study on shear-lag effect of prestressed concrete curved box beam[D]. Tianjin:Tianjin University, 2005. (in Chinese)[9] 程军,扶名福,林治平.有机玻璃的力学与光塑性性能[J].天津大学学报,2000,1(33):85-87.CHENG Jun,FU Ming-fu,LIN Zhi-ping. Mechanical and photo plasticity research of polymethyl methacrylate[J]. Journal of Tianjin University, 2000, 1(33):85-87.(in Chinese)[10] 彭聪,张鹏梁,孙凯.基于ANSYS的桥梁地震响应有限元分析[J].山西建筑,2007, 5(15): 53-54.PENG Cong,ZHANG Peng-liang,SUN Kai. FEA of bridge's earthquake respondence on ANSYS[J]. Shanxi Architecture,2007,5(15):53-54.(in Chinese)
[1]卢海林,张 伟,南子俊,等.移动荷载速度对悬臂曲线箱梁剪力滞效应的影响[J].武汉工程大学学报,2014,(03):52.
LU Hai-linZHANG WeiNAN Zi-junQIAN Chao-bangZHANG Shan.Moving load speed on shear lag effect of cantilever curved box girder[J].Journal of Wuhan Institute of Technology,2014,(12):52.
[2]卢海林,张伟,颜昌雄.移动荷载速度对悬臂曲线箱梁剪力滞效应的影响[J].武汉工程大学学报,2014,(03):18.[doi:103969/jissn16742869201403004]
LU Hai lin,ZHANG Wei,YAN Chang xiong.Moving load speed on shear lag effect of cantilever curved box girder[J].Journal of Wuhan Institute of Technology,2014,(12):18.[doi:103969/jissn16742869201403004]
[3]卢海林,张 山,万崇勇,等.静动荷载作用下简支预应力混凝土曲线箱梁剪力滞效应分析[J].武汉工程大学学报,2016,38(05):465.[doi:10. 3969/j. issn. 1674?2869. 2016. 05. 011]
LU Hailin,ZHANG Shan,WAN Chongyong,et al.Shear Lag Effect of Curved Box Girder of Simply-Supported Prestressed Concrete Under Static and Dynamic Load[J].Journal of Wuhan Institute of Technology,2016,38(12):465.[doi:10. 3969/j. issn. 1674?2869. 2016. 05. 011]